Pages

Sunday, 23 September 2012

Direction...

I'm at risk of starting too many jobs at the same time so going to plan a specific direction;

Target:


Get the side panels on, which in turn will allow fitting the firewall, scuttle etc
Before they go on I need to:

Interior areas preparation:

  1. Complete the chassis loom routing - working forwards from the boot space along the tunnel
  2. Install the spare wheel mounting bracket on the rear panel
  3. Complete the boot space carpets
  4. Complete the transmission tunnel & nearside footwell carpets 
(all the carpets together so the adhesive doesn't go off in the can after opening)

Engine bay preparation:

  1. Complete the engine loom routing - including IACV extra circuit
  2. Install the HP fuel circuit
  3. Install the water catch tank & washer bottle
  4. Install (or at least plan & route) control cables: Clutch & Accelerator