Aligned all jubilee clips so I can get to them when the sides are enclosed and engine in & gave all the joints a good tug to check everything is tightened.
Red incoming, black return to the tank.
These were re routed a little higher later when the engine was in place to miss the bell housing: Fuel line run tidy up